A concise register drawn from Prestige Thermal Energy material, organised for an initial technical discussion.
Prestige’s supplied project list covers waste to energy, pyrolysis and industrial thermal work in Europe, Africa and the United States. The entries retain the names and descriptions in that material. Ask Prestige to confirm present status, scope and supporting documents for any specific project.
Ten entries from Prestige material, organised by location and application.
Energy fraction of municipal solid waste; the sheet gives a planned first phase of 50 MW.
Abattoir waste combined heat and power plant; the sheet says the project was completed and a new site was in progress.
Sewerage waste to power; the sheet lists a September 2019 completion target.
Municipal solid waste energy fraction to power; one of two separately listed entries under the same name.
A second municipal solid waste to power entry, with a different value and December 2020 target in the sheet.
Continuous cast link and sealed quench scheme; the sheet states commissioning was complete.
Raw municipal solid waste to energy scheme; the sheet reports an order awarded in November 2017.
Plastics to diesel plant; the sheet states it was commissioned in 2018 with a refining section installed.
Pyrolysis plant for metals recovery; the sheet states installation and commissioning were complete.
Medical waste to power; the sheet lists an October 2019 completion target.
Source: historical Prestige Thermal Energy project list supplied to ANY STONE. Current project status requires supplier confirmation.
ANY STONE can coordinate an initial discussion around a defined opportunity. Equipment configuration, rights, delivery roles and any joint venture structure must be agreed for that project.